EGen Control System Modernization

We recently successfully undertook a project to modernize the E-Gen control system onboard APL Belgium. This project was in collaboration with Schneider ELectric (Singapore). The project was carried out in Yiu Lian Shipyard, Shenzhen, PRC. You can see from the picture to the left that the old E-Gen gauges (small black panel in the foreground) and the old control panel (where my colleagues are) were installed in separate locations. In terms of workflow, we dont think it's a good idea since the operator cant exactly monitor, decide and control efficiently. It's very important that we design and install systems that are congruguent with effective workflow. This will allow the operator to work

Featured Posts
Recent Posts
Archive
Search By Tags

©June 2019 Powered by Power Absolut. All Rights Reserved